North London Waste Authority – Heat and Power Project

Background

The North London Waste Authority (NLWA) is responsible for arranging the disposal, recycling and composting of waste collected by seven North London boroughs. In order to meet future waste management demand and minimise the amount of waste sent to landfill, NLWA proposes building an Energy Recovery Facility to replace the existing plant at Edmonton EcoPark by 2025.

As part of the DCO pre-application stage for the project, NLWA conducted a public consultation on the proposed development to ensure that the community and other interested parties have a chance to understand and provide feedback on the proposals.

OPM Group worked with NLWA to provide robust and transparent consultation and engagement with stakeholders and the public.

What did we do

OPM Group’s role involved providing strategic advice on the approach to community consultation, supporting event and materials design, developing and hosting the consultation response website and conducting analysis and reporting.

We liaised closely with NLWA and its technical consultants to ensure that our consultation outputs allowed the project’s technical team to hear, act upon and respond to the issues raised by respondents.

Outcome

A summary of responses from the two phases of public consultation was made publicly available, along with NLWA’s response to the issues raised, so that those who participated can see how their comments have informed the next stage of development.

NLWA’s application has now been accepted by the Planning Inspectorate and is awaiting a decision.